Module 6 Construction Project

Status of Completion

Task
 
Percent Complete
 
Excavation of Module 6 100% Pan Lysimeter 100%
Toe Berm (along HWY 227) 100% Leachate Sump 100%
Entrance Area (by flare pad) 100% Leachate Collection Lines 100%
Stock Pile A 100% Leachate Force Main 100%
Stock Pile 3 100% Drainage Layer 100%
Leachate Facility Pad 100% Operations Layer 100%
Culverting Main Drainage Channel 100% Leachate Transfer Facility 100%
Liner Installation 100% Storm Water Drainage System 100%
Access Roads 100%    

 

 

 