Task
|
|
Percent Complete
|
|
| Excavation of Module 6 |
100% |
Pan Lysimeter |
100% |
| Toe Berm (along HWY 227) |
100% |
Leachate Sump |
100% |
| Entrance Area (by flare pad) |
100% |
Leachate Collection Lines |
100% |
| Stock Pile A |
100% |
Leachate Force Main |
100% |
| Stock Pile 3 |
100% |
Drainage Layer |
100% |
| Leachate Facility Pad |
100% |
Operations Layer |
100% |
| Culverting Main Drainage Channel |
100% |
Leachate Transfer Facility |
100% |
| Liner Installation |
100% |
Storm Water Drainage System |
100% |
| Access Roads |
100% |
|
|